• Tour Accommodation Part 2.wmv

    Tour through the accommodation of the 46k DWT tanker "Iver Express"

    published: 02 Mar 2010
  • Accommodation Vessels Crew Transfer

    published: 20 Nov 2015
  • FAST OFFSHORE SUPPORT VESSEL - INTERIOR ARRANGEMENT

    45 Meter FAST OFFSHORE SUPPORT VESSEL - INTERIOR ARRANGEMENT OF WHEEL HOUSE, ENGINE ROOM, PASSENGER AREA, VIP AREA, CABIN, ETC.

    published: 03 Apr 2016
  • NAUTICAL ADLIN: Accommodation Workboat (DP2), Offshore Support Vessel

    published: 09 Oct 2015
  • My cabin on a cargo ship.

    I was scheduled to spend 8 days in this cabin in a cargo ship, but it turned into 9. Good thing the accommodations were comfortable!

    published: 05 Jun 2015
  • Accommodation & Repair Vessel ARV 1 by aerial photographer Tommy Chia, Singapore.

    First of it's kind an Accommodation & Repair Vessel for the Offshore, marine, oil & gas industry refurbished by Sembawang Shipyard. Singapore aerial photographer for Aerial photography & Aerial video filming for housing, shipping, marine, oil & gas industries. shots from EC120 helicopter using Nikon D3 and Sony Z5 HD video cam.

    published: 11 Aug 2011
  • ELEONORA MÆRSK VESSEL TOUR

    published: 04 Apr 2013
  • offshore accommodation

    published: 17 Nov 2015
  • Behind the Scenes Look Into a LNG Vessel Dry-docking | Teekay

    A Giant’s Makeover Docking, cleaning, blasting, painting, anchor replacement, shaft inspection, propeller cleaning and testing, lifeboat inspection and testing, cargo tank inspection and testing, pump overhauls, main engine inspection, sea chest inspection, bridge upgrades… Phew! All this, and many more inspections, repairs, upgrades and testing so she can sail away all shiny and new for another 5 years! Learn more: http://bit.ly/2hvzjFl

    published: 04 Aug 2017
  • Kabina Deck Cadet Statek / Vessel Cabin Deck Cadet General Cargo

    Ten film powstał przy użyciu Edytora wideo YouTube (http://www.youtube.com/editor).

    published: 09 Mar 2014
  • Ship cooks: how they keep the world turning

    description

    published: 03 Jan 2015
  • [Muted] Living on a Container Ship (Repaired version is available)

    ATTENTION! Original video has been muted worldwide by UMG and Bee Gees Catalog because of 35 seconds of their music used in this video... Sorry for that, but it can not be edited anymore due to YouTube restrictions... The new one is here: https://www.youtube.com/watch?v=id3bvRFyQB4

    published: 14 Feb 2015
  • Davie: Accommodation Support Vessel 4004

    Animation of the construction of Accommodation Support Vessel 4004 at Davie Shipbuilding

    published: 04 Mar 2013
  • Offshore engine room tour Offshore Support Vessel LCT abu dhabi

    engine room offshore...

    published: 28 Nov 2015
  • Straight Talk about Accommodation and Self-Disclosure by Marian Vessels

    published: 31 Oct 2016
  • Derrick Lay Vessel 2000

    The DLV 2000 provides versatility for projects requiring a combination of pipelay, heavy lift, large deck space and offshore workforce accommodation. The capabilities traditionally required by many vessels are now available from one.

    published: 27 Jul 2016
  • container ship cabin / quarters

    This is the cabin space for one on a container ship-better class travel then on a 'princess cruise' because there are only 22 persons instead of 2200...better food, better service (because you serve yourself-or have the 'mess-man' serve you)!!

    published: 30 May 2013
  • Must Watch- Engine Room Tour of Cargo ship

    This Video is shot by Marine Engineer Arjun Kalra in a container ship- MSC MATILDE. He has brilliantly covered all the important engine room machinery and systems right from tunnel to funnel (Top to Bottom). If you are a new bee, this is a must watch video to understand how the engine room of a cargo ship looks like. Thank You Arjun Kalra for submitting this video.

    published: 08 May 2014
  • Wind Turbine Installation Vessel BLUE AMBER

    The installation of 8MW++ wind turbines further offshore in water depth up to 60 meters is not a dream anymore. Neptun Ship Design offers an innovative solution to wind farm developers, wind turbine manufactures and operators around the world. The Jack-Up vessel “Blue Amber” is specifically designed for the efficient and safe installation of the future generation wind turbines. The DP2-dynamic positioning of the WTIV provides unique capabilities for jacking close to the jacket foundation clearance zone of the offshore installation. The vessel’s efficient energy management system in combination with the clean design notation promises an environmental friendly and sustainable ownership. The 4 leg vessel is able to transport 6 turbine sets, consisting of tower, nacelle and blades. The Install...

    published: 24 Mar 2016
  • Rockwater 2 - Diving Vessel

    The Rockwater 2 is a diving vessel. • Length 119m x breadth 22m • Deck area 1,150m² • Accommodation for 106 persons • Heave compensated 200t offshore crane with 300t harbour lift capacity (2 fall mode when lifting 200t) • 1 x work-class ROV • 16-man single bell saturation dive system rated to 300m and one hyperbaric lifeboat General Information Classification LR, +100A1, LMC, DP(AA) UMS, Ice-class 3 Built de Hoop, Netherlands (1984) Flag State Authority Bahamas Maritime Authority Port of Registry Nassau Dimensions Length Overall 118.55m Breadth 22m Depth 7.6m Draught (summer) 5.312m Deadweight 3,023.9t Gross Tonnage 5,991t Net Tonnage 1,797t Manoeuvring and Propulsion Systems Main Engines 5 x 1,700kW (Brons-MAN ASL25/30) Generators 5 x 2,125kVA (NEBB WAB 630) Emergency Generator 1 x GM Typ...

    published: 27 Feb 2016
  • W2W Project - The 'KROONBORG' documentary

    A motion compensated Ampelmann gangway system, world’s first heave compensated Barge Master T40 crane, DP2 system, Voith Schneider Propellers and bow thrusters, chemical supply and Cold start-up unit, 500m2 free deck space, a fast rescue craft, daughter craft and accommodation facilities for 60 people on board. One by one essential features which are pretty common for an offshore vessel. But by combining these specs in one single design– like a kind of Swiss knife – you will get a unique vessel the world has not seen before. Enabling offshore activities to be executed more safe and efficient. NAM and Shell UK combined their forces with Royal Wagenborg and shipyard Royal Niestern Sander, which resulted in the world’s first maintenance support walk to work vessel. This is the epic story a...

    published: 10 Jun 2015
  • Gangway Preparation

    published: 01 Oct 2012
  • HI-FOG fire protection for accommodation

    Animation demonstrating HI-FOG® system for accommodation and service areas in passenger vessels. HI-FOG® is a high-pressure water mist fire protection system that has been tested and approved for many types of spaces. And because it uses pure water, HI-FOG® poses no risk to people or property. More information: www.marioff.com (Animation by Presentor)

    published: 14 Jun 2010
  • Zentech ZeeRig 1 Accommodations Vessel

    Zentech is the owner of Zee Rig 1, a Semi-SWATH technology vessel that is approximately 75% complete and in a bare-deck configuration. The vessel is berthed in Houston, Texas where it is undergoing outfitting. Zentech owns the design rights to this ves- sel and the related family of Semi-SWATH units. Specifications: • Ultra-stable vessel • Length 237 Ft., Breadth 95 Ft. (Length 72.2 m, Breadth 29.0 m) • Top Deck Open Space 15,000 Ft.2 (1,400 m2) • Below Deck Open Space 16,500 Ft.2 (1,550m2) • Sea-keeping and motion charac- teristics up to Sea State 5 • Self-propelled and DP (DP-II capable upon request) • Available for Charter within 6-9 months • Located in Green Cove Springs, Florida • Bare-deck will be configured to client requirements • U.S. Flag Vessel, Jones Act compliant Suitable Fo...

    published: 22 Sep 2014
developed with YouTube
Tour Accommodation Part 2.wmv

Tour Accommodation Part 2.wmv

  • Order:
  • Duration: 6:46
  • Updated: 02 Mar 2010
  • views: 46136
videos
Tour through the accommodation of the 46k DWT tanker "Iver Express"
https://wn.com/Tour_Accommodation_Part_2.Wmv
Accommodation Vessels Crew Transfer

Accommodation Vessels Crew Transfer

  • Order:
  • Duration: 1:48
  • Updated: 20 Nov 2015
  • views: 886
videos
https://wn.com/Accommodation_Vessels_Crew_Transfer
FAST OFFSHORE SUPPORT VESSEL - INTERIOR ARRANGEMENT

FAST OFFSHORE SUPPORT VESSEL - INTERIOR ARRANGEMENT

  • Order:
  • Duration: 7:51
  • Updated: 03 Apr 2016
  • views: 21602
videos
45 Meter FAST OFFSHORE SUPPORT VESSEL - INTERIOR ARRANGEMENT OF WHEEL HOUSE, ENGINE ROOM, PASSENGER AREA, VIP AREA, CABIN, ETC.
https://wn.com/Fast_Offshore_Support_Vessel_Interior_Arrangement
NAUTICAL ADLIN: Accommodation Workboat (DP2), Offshore Support Vessel

NAUTICAL ADLIN: Accommodation Workboat (DP2), Offshore Support Vessel

  • Order:
  • Duration: 1:01
  • Updated: 09 Oct 2015
  • views: 972
videos
https://wn.com/Nautical_Adlin_Accommodation_Workboat_(Dp2),_Offshore_Support_Vessel
My cabin on a cargo ship.

My cabin on a cargo ship.

  • Order:
  • Duration: 1:24
  • Updated: 05 Jun 2015
  • views: 151749
videos
I was scheduled to spend 8 days in this cabin in a cargo ship, but it turned into 9. Good thing the accommodations were comfortable!
https://wn.com/My_Cabin_On_A_Cargo_Ship.
Accommodation & Repair Vessel ARV 1 by aerial photographer Tommy Chia, Singapore.

Accommodation & Repair Vessel ARV 1 by aerial photographer Tommy Chia, Singapore.

  • Order:
  • Duration: 4:25
  • Updated: 11 Aug 2011
  • views: 7159
videos
First of it's kind an Accommodation & Repair Vessel for the Offshore, marine, oil & gas industry refurbished by Sembawang Shipyard. Singapore aerial photographer for Aerial photography & Aerial video filming for housing, shipping, marine, oil & gas industries. shots from EC120 helicopter using Nikon D3 and Sony Z5 HD video cam.
https://wn.com/Accommodation_Repair_Vessel_Arv_1_By_Aerial_Photographer_Tommy_Chia,_Singapore.
ELEONORA MÆRSK VESSEL TOUR

ELEONORA MÆRSK VESSEL TOUR

  • Order:
  • Duration: 17:00
  • Updated: 04 Apr 2013
  • views: 403018
videos
https://wn.com/Eleonora_Mærsk_Vessel_Tour
offshore accommodation

offshore accommodation

  • Order:
  • Duration: 1:34
  • Updated: 17 Nov 2015
  • views: 2831
videos
https://wn.com/Offshore_Accommodation
Behind the Scenes Look Into a LNG Vessel Dry-docking | Teekay

Behind the Scenes Look Into a LNG Vessel Dry-docking | Teekay

  • Order:
  • Duration: 2:45
  • Updated: 04 Aug 2017
  • views: 15743
videos
A Giant’s Makeover Docking, cleaning, blasting, painting, anchor replacement, shaft inspection, propeller cleaning and testing, lifeboat inspection and testing, cargo tank inspection and testing, pump overhauls, main engine inspection, sea chest inspection, bridge upgrades… Phew! All this, and many more inspections, repairs, upgrades and testing so she can sail away all shiny and new for another 5 years! Learn more: http://bit.ly/2hvzjFl
https://wn.com/Behind_The_Scenes_Look_Into_A_Lng_Vessel_Dry_Docking_|_Teekay
Kabina Deck Cadet Statek / Vessel Cabin Deck Cadet General Cargo

Kabina Deck Cadet Statek / Vessel Cabin Deck Cadet General Cargo

  • Order:
  • Duration: 6:28
  • Updated: 09 Mar 2014
  • views: 14853
videos
Ten film powstał przy użyciu Edytora wideo YouTube (http://www.youtube.com/editor).
https://wn.com/Kabina_Deck_Cadet_Statek_Vessel_Cabin_Deck_Cadet_General_Cargo
Ship cooks: how they keep the world turning

Ship cooks: how they keep the world turning

  • Order:
  • Duration: 2:08
  • Updated: 03 Jan 2015
  • views: 59813
videos
description
https://wn.com/Ship_Cooks_How_They_Keep_The_World_Turning
[Muted] Living on a Container Ship (Repaired version is available)

[Muted] Living on a Container Ship (Repaired version is available)

  • Order:
  • Duration: 24:24
  • Updated: 14 Feb 2015
  • views: 2431334
videos
ATTENTION! Original video has been muted worldwide by UMG and Bee Gees Catalog because of 35 seconds of their music used in this video... Sorry for that, but it can not be edited anymore due to YouTube restrictions... The new one is here: https://www.youtube.com/watch?v=id3bvRFyQB4
https://wn.com/Muted_Living_On_A_Container_Ship_(Repaired_Version_Is_Available)
Davie: Accommodation Support Vessel 4004

Davie: Accommodation Support Vessel 4004

  • Order:
  • Duration: 2:56
  • Updated: 04 Mar 2013
  • views: 1720
videos
Animation of the construction of Accommodation Support Vessel 4004 at Davie Shipbuilding
https://wn.com/Davie_Accommodation_Support_Vessel_4004
Offshore engine room tour Offshore Support Vessel  LCT abu dhabi

Offshore engine room tour Offshore Support Vessel LCT abu dhabi

  • Order:
  • Duration: 8:08
  • Updated: 28 Nov 2015
  • views: 3556
videos
engine room offshore...
https://wn.com/Offshore_Engine_Room_Tour_Offshore_Support_Vessel_Lct_Abu_Dhabi
Straight Talk about Accommodation and Self-Disclosure by  Marian Vessels

Straight Talk about Accommodation and Self-Disclosure by Marian Vessels

  • Order:
  • Duration: 39:37
  • Updated: 31 Oct 2016
  • views: 63
videos
https://wn.com/Straight_Talk_About_Accommodation_And_Self_Disclosure_By_Marian_Vessels
Derrick Lay Vessel 2000

Derrick Lay Vessel 2000

  • Order:
  • Duration: 3:30
  • Updated: 27 Jul 2016
  • views: 16136
videos
The DLV 2000 provides versatility for projects requiring a combination of pipelay, heavy lift, large deck space and offshore workforce accommodation. The capabilities traditionally required by many vessels are now available from one.
https://wn.com/Derrick_Lay_Vessel_2000
container ship cabin / quarters

container ship cabin / quarters

  • Order:
  • Duration: 4:24
  • Updated: 30 May 2013
  • views: 19394
videos
This is the cabin space for one on a container ship-better class travel then on a 'princess cruise' because there are only 22 persons instead of 2200...better food, better service (because you serve yourself-or have the 'mess-man' serve you)!!
https://wn.com/Container_Ship_Cabin_Quarters
Must Watch- Engine Room Tour of Cargo ship

Must Watch- Engine Room Tour of Cargo ship

  • Order:
  • Duration: 20:51
  • Updated: 08 May 2014
  • views: 421856
videos
This Video is shot by Marine Engineer Arjun Kalra in a container ship- MSC MATILDE. He has brilliantly covered all the important engine room machinery and systems right from tunnel to funnel (Top to Bottom). If you are a new bee, this is a must watch video to understand how the engine room of a cargo ship looks like. Thank You Arjun Kalra for submitting this video.
https://wn.com/Must_Watch_Engine_Room_Tour_Of_Cargo_Ship
Wind Turbine Installation Vessel BLUE AMBER

Wind Turbine Installation Vessel BLUE AMBER

  • Order:
  • Duration: 3:25
  • Updated: 24 Mar 2016
  • views: 14324
videos
The installation of 8MW++ wind turbines further offshore in water depth up to 60 meters is not a dream anymore. Neptun Ship Design offers an innovative solution to wind farm developers, wind turbine manufactures and operators around the world. The Jack-Up vessel “Blue Amber” is specifically designed for the efficient and safe installation of the future generation wind turbines. The DP2-dynamic positioning of the WTIV provides unique capabilities for jacking close to the jacket foundation clearance zone of the offshore installation. The vessel’s efficient energy management system in combination with the clean design notation promises an environmental friendly and sustainable ownership. The 4 leg vessel is able to transport 6 turbine sets, consisting of tower, nacelle and blades. The Installation of one turbine set on a jacket structure will require maximum 5 heavy lifts each. The main crane with SWL 2000To@45m and trolley / tugger arrangement on boom is operated by frequency controlled machinery under deck. Comfort class accommodation is provided for 120 persons. A save crew change is guaranteed via helicopter platform with integrated Jet A1 refueling system. Close development coordination and cooperation with market leaders for the main equipment packages makes it now possible to present you a custom made vessel concept, which is focused on lowering the levelised cost of energy -LCoE-, which is the main target of the offshore wind industry. http://www.neptun-germany.com/index.php?id=148
https://wn.com/Wind_Turbine_Installation_Vessel_Blue_Amber
Rockwater 2 -  Diving Vessel

Rockwater 2 - Diving Vessel

  • Order:
  • Duration: 4:41
  • Updated: 27 Feb 2016
  • views: 878
videos
The Rockwater 2 is a diving vessel. • Length 119m x breadth 22m • Deck area 1,150m² • Accommodation for 106 persons • Heave compensated 200t offshore crane with 300t harbour lift capacity (2 fall mode when lifting 200t) • 1 x work-class ROV • 16-man single bell saturation dive system rated to 300m and one hyperbaric lifeboat General Information Classification LR, +100A1, LMC, DP(AA) UMS, Ice-class 3 Built de Hoop, Netherlands (1984) Flag State Authority Bahamas Maritime Authority Port of Registry Nassau Dimensions Length Overall 118.55m Breadth 22m Depth 7.6m Draught (summer) 5.312m Deadweight 3,023.9t Gross Tonnage 5,991t Net Tonnage 1,797t Manoeuvring and Propulsion Systems Main Engines 5 x 1,700kW (Brons-MAN ASL25/30) Generators 5 x 2,125kVA (NEBB WAB 630) Emergency Generator 1 x GM Type 12v-72t Main Propulsion 2 x 1,880kW azimuth thrusters (Liaanen) Tunnel Thrusters (bow) 3 x 790kW (Brunvoll) Dynamic Positioning Systems DP Classification DP(AA) (Class II) DP System Kongsberg Simrad SDP 521 Reference Systems 3 x DGPS 2 x lightweight taut wire 1 x Kongsberg HiPAP 500 system 1 x Sonardyne LUSBL 1 x fanbeam MDL Mk4 Speed / Consumptions Economical Speed 10 knots at 22t/per day Full Speed 11.5 knots at 28.5t/per day DP Operations 16t/per day Tank Capacities (100%) Fuel Oil 1,930m3 Fresh Water 410m3 Ballast Water 1,622m3 Lub. Oil 33m3 Cargo Deck Deck Area 1,150m2 Deck Strength 5t/m2 Rockwater 2 Communications Systems The vessel is fitted with Inmarsat B, Inmarsat C and V-SAT C Band. Accommodation 106 persons Single Cabins 14 Double Cabins 44 Quadruple 1 Deck Cranes Main Deck Crane I (Port) (Main Wire) 300t between 6-10m (harbour lift) 200t between 6-17m (offshore lift) (Whip Line) 15t at 35m (offshore lift), and 7.5t (man-riding) The primary main deck crane (Kenz) is active heave compensated (both main wire & whip wire) and is positioned on the port side of the main deck. Active heave compensation can be selected with the main hoist in 1 or 2 fall mode, and with whip hoist. With reference to the Kenz crane, there is a recovery limitation which is detailed in the Rockwater 2 Retrieval curve acc DNV 2008 - rev F issued 20-5-2009. Note: there are no limitations on deployment operations and the crane is operating as designed. Main Deck Crane II (Stbd) Main Hoist Retractable SWL 50t 4-12.5m SWL 27.5t 4-20m Main Hoist Extended SWL 50t 4-12.5m SWL 10t 4-34m Auxiliary Hoist Retractable SWL 5t 6-22m Auxiliary Hoist Extended SWL 5t 6-36m (man-riding capability is possible if emergency power supply is provided by a deck generator) No AHC fitted to crane Auxiliary Deck Crane I (Stbd Boat Deck) 5t at 15m (man-riding) Auxiliary Deck Crane II (Stores Crane) 1.5t ROV Systems The vessel is fitted with one work-class ROV as standard. Dive System The saturation diving system is classed by Lloyds Register of Shipping. Saturation System 16 man at 300m Chambers 3 Bell 1 x 3 man SPHL 1 x 15 Divers and 3 crews Dive Moonpool 1 x diving 3.6m dia A second working moonpool is also available (4.6m dia). Currently plated in at hull and main deck levels. Helideck The vessel is fitted with an approved and certified helideck. The helideck has a D-Value of 22.2m and T-Value of 11t and approved for helicopters of the size up to EC225 and Sikorsky S61N.
https://wn.com/Rockwater_2_Diving_Vessel
W2W Project - The 'KROONBORG' documentary

W2W Project - The 'KROONBORG' documentary

  • Order:
  • Duration: 45:01
  • Updated: 10 Jun 2015
  • views: 163960
videos
A motion compensated Ampelmann gangway system, world’s first heave compensated Barge Master T40 crane, DP2 system, Voith Schneider Propellers and bow thrusters, chemical supply and Cold start-up unit, 500m2 free deck space, a fast rescue craft, daughter craft and accommodation facilities for 60 people on board. One by one essential features which are pretty common for an offshore vessel. But by combining these specs in one single design– like a kind of Swiss knife – you will get a unique vessel the world has not seen before. Enabling offshore activities to be executed more safe and efficient. NAM and Shell UK combined their forces with Royal Wagenborg and shipyard Royal Niestern Sander, which resulted in the world’s first maintenance support walk to work vessel. This is the epic story about the ‘KROONBORG’, the result of the innovative Walk-to-Work project. A Dutch project that will change the entire offshore industry.
https://wn.com/W2W_Project_The_'KROONBORG'_Documentary
Gangway Preparation

Gangway Preparation

  • Order:
  • Duration: 2:34
  • Updated: 01 Oct 2012
  • views: 5448
videos
https://wn.com/Gangway_Preparation
HI-FOG fire protection for accommodation

HI-FOG fire protection for accommodation

  • Order:
  • Duration: 1:36
  • Updated: 14 Jun 2010
  • views: 6759
videos
Animation demonstrating HI-FOG® system for accommodation and service areas in passenger vessels. HI-FOG® is a high-pressure water mist fire protection system that has been tested and approved for many types of spaces. And because it uses pure water, HI-FOG® poses no risk to people or property. More information: www.marioff.com (Animation by Presentor)
https://wn.com/Hi_Fog_Fire_Protection_For_Accommodation
Zentech ZeeRig 1 Accommodations Vessel

Zentech ZeeRig 1 Accommodations Vessel

  • Order:
  • Duration: 4:24
  • Updated: 22 Sep 2014
  • views: 3856
videos
Zentech is the owner of Zee Rig 1, a Semi-SWATH technology vessel that is approximately 75% complete and in a bare-deck configuration. The vessel is berthed in Houston, Texas where it is undergoing outfitting. Zentech owns the design rights to this ves- sel and the related family of Semi-SWATH units. Specifications: • Ultra-stable vessel • Length 237 Ft., Breadth 95 Ft. (Length 72.2 m, Breadth 29.0 m) • Top Deck Open Space 15,000 Ft.2 (1,400 m2) • Below Deck Open Space 16,500 Ft.2 (1,550m2) • Sea-keeping and motion charac- teristics up to Sea State 5 • Self-propelled and DP (DP-II capable upon request) • Available for Charter within 6-9 months • Located in Green Cove Springs, Florida • Bare-deck will be configured to client requirements • U.S. Flag Vessel, Jones Act compliant Suitable For: • Offshore wind farm maintenance and service work • Floating hotel • General offshore service support • Sub-sea ROV or dive support work • Commuter or shuttle passenger service
https://wn.com/Zentech_Zeerig_1_Accommodations_Vessel
×